Modelling what might have been in southeast BC and northwest Wasington

Morning Star Mine development 1

One corner of the layout just begged for a mine to fill an otherwise empty space, so some ideas where tossed around. It quickly became clear than a simple spur off of the mainline simply would not do, as it would be rather boring to switch. Stop, pickup a couple of cars, drop off a couple of cars, and carry on. Ho, hum.

An alternative presented itself in the idea of a short branch line heading back north from Curlew to the mine. This would represent a distance great enough to require a dedicated train, complete with caboose, to switch the mine. Even though the distance is not great, and the number of cars low, all of the elements of a branch line train would be there, to add operational interest.

Once again, the CAD program helped to plan what could actually be done in the small space, without sacrificing too much on curves and grades. It quickly became apparent that a small run around track plus the mine spur itself could be squeezed in, resulting in about three cars to and from the mine.

Morning Star Mine arrangement.
Continue reading “Morning Star Mine development 1”

Trying to get the #$@&%*! plywood flat

After all of the work that went in to installing the joists and risers so that the section would be level, the stars conspired against us in the form of warped plywood. This is the tale of that pursuit.

But first, a bit of background on my usual construction methods. All of the sub-roadbed so far on the layout is composed on two layers of 3/8” fir plywood, laminated together from narrow arcs and straight bits that fit under the tracks. With this approach there are no splice plates per se, as the plywood pieces form a continuous two layer sandwich all around the layout. This has proven to be a very good approach as can be attested to by the lack of running issues on the rest of the layout. One problem with it, however, is that the areas between the tracks are wide open, and more bits have to be pieced together to fill in for buildings, etc. This was quite a job under Grand Forks, as it seemed that I was always adding another bit to support something or another.

And then the bright idea hit me! For Curlew, as it was all going to be completely flat so as to facilitate switching and not having cars roll away from the operators, I decided to try laminating two layers of large sheets of the same 3/8” plywood, in the hope that I could get a nice flat area for both the tracks and the town, all at once. All of the plywood these days seems to be warped in one way or another, and the best that I could find locally was no different. I have always glued the layers back to back, so that any warps should cancel out. This has worked very well on the thin strips used before, so I assumed that it would be similar for the larger sheets. Well, it seems that I was wrong. Once everything was glued and dried, I noticed that there were in fact a few places where it went up and down, and not just a tiny bit. My guess is that the dynamics of the wood are different along the edges than in the middle of the sheet as the worst spots are where there is a joint on one side or the other. The three big main pieces were all offset from one another to avoid having adjacent joints on both layers. While this works well with the thin strips, it seems that it doesn’t for large sheets. At one spot the two top sheets curl up a bit making a cusp, even though they were screwed and clamped together as flat as I could make it. Earlier posts show the lengths I went to to clamp them flat.

Ok, I thought, no real problem, as we can sort it all out when the plywood gets screwed down to the risers. They can be adjusted upwards and downwards to fix bumps or dips. John’s pictures show the effort that went into getting the many risers attached at just the right elevation, by using the laser level (thank you very much!). Again, it seemed like a good idea to all of us at the time…

I quickly realized that I needed some specialized tools to see just how warped the plywood was. I devised some targets for the laser level that show if any point on the plywood is at the correct height or not. I realized that using the laser on the edge of the plywood is not good enough when it is wide and may be cupped. I came up with a two step block idea where the goal is to split the beam on the edge, with the upper half of the beam hitting the second block. That one is set back a bit, so it is easy to see if the beam is only on the lower block, (too high), only on the upper block (too low), or split between the two (just right). I will make up some from high grade birch plywood so that they are all the exact same thickness. I had to hunt through many pieces of my 1×4 supply to find a bunch that were the same thickness, so it’s time for a special tool.

Movable laser leveling blocks
Continue reading “Trying to get the #$@&%*! plywood flat”

Look up, way up

The first task during the week was to glue the two layers of plywood together so that they all formed one big continuous sheet right around the corner. Sounds simple enough… It was at this stage that it became apparent that the warping in the plywood was quite strong and even though the plywood was weighted to try to remove the warping as the glue dried, this was going to be a problem. More about that later.

Gluing the plywood layers required some wide clamps.

The next step was to locate the permanent joists so that they would not interfere with the track switch machines. Gordie’s marvelous paper layout drawing was again taped to the plywood, aligned with the registration marks, as it would be placed and removed many times.

Gordie’s full size paper drawing was our constant guide.
Continue reading “Look up, way up”

Curlew design starts

Once Darestof had been rebuilt, it was put away to enable the construction of the next town south, namely Curlew. This was started with a lot of discussion about what should go there, what would fit, etc., etc.

To start the discussions, I used an extra wide-angle lens on my iPhone to get a “bird’s eye view” of the area, with a few pieces of cardboard to set the stage.

After that, we rolled out big sheets of white paper and taped it to the cardboard, and Gordie got to work doodling away!

Continue reading “Curlew design starts”

Darestof urban renewal

The original town of “Darestof” (Da Rest Of the world… thanks to Suzy) was built as a moveable end of the line turn around module to facilitate operating sessions as the layout construction advances around the room. It has a few industries, plus main and passing track loops that double as the south staging yard. Unfortunately its design and construction were somewhat lacking. The design placed the manual throw switches towards the back where they were hard to reach, and the construction used Atlas code 100 track and switches which proved to be troublesome.

The old track was removed, and the plywood flipped over to enable a new design. The new track would be Peco code 100 which has proven to be very successful in the main upper and lower staging yards.

So, with a blank piece of paper (or plywood) to work on, Gordie once again set to work playing with bits of track to see what would fit. We had discussed the idea that the ultimate end of the layout would be some rendition of Spokane’s north west industrial area, so he worked in some of those ideas, rather than just arrange the tracks randomly.

Continue reading “Darestof urban renewal”

A town at the border

When the main line was build past the town of Carson, only a switch from the main track was installed. Carson is located southwest of Grand Forks and is right on the US border. In reality it had no rail served industries, but we are not going to let a little historical fact like that stop us! Gordie came over one evening and we brainstormed and doodled with the idea of getting as much switching activity as possible in a very small space. We also had to include the border, with some form of customs house. He had a brilliant suggestion that with a spur for the customs house, cars could be randomly selected for inspection moving in either direction, so this became another of those “universal industries” that can accept any type of car.

I had realized that to have enough tracks to be worthwhile, the land first had to be extended just a little, so out came the plywood and clamps…

Then Gordie went to work and played around with bits of track until he had a very workable arrangement. I captured it for posterity (and so I could remember it!) using a panorama feature on my iPhone.